Content
Old Fuller Warren Bridge Study
On April 25, 2005, Public Works director Alan Mosley presented a draft report to the Waterways Commission on the viability and feasibility of retrofitting the remaining southbank section of the old Fuller Warren bridge into a recreational/fishing pier.
Click here to download a copy of the Old Fuller Warren Bridge Study Report (pdf 7.94 MB).
NOTE: Viewing this report requires Adobe Acrobat Reader, available free from Adobe. If you do not have Acrobat Reader, you may click here to link to the Adobe website for a free download.
This is a very large file and will take 30 minutes or more to download with a dial-up modem, and up to two minutes when using a DSL or high-speed connection.